Software design is actually a multi step process that focuses on _______ distinct attributes of a program

2

3

4

5

 

When you build a product or system, it's important to go through a series of predictable steps – a road map that helps you create a timely, high-quality result, The road map that you follow is called a __________

Software design

Software Process

Software schedule

Framework

The check-in and checkout facilities provide___________

Best control

Component control

SCI control

Synchronization control

 

Which of the following might require re-baselining of the cost baseline?

Corrective action

Revised cost estimates

Updates to the cost management plan

Budget updates

 

Once the review is complete, the Software Requirements Specification is "signed-off by _________

Developer

Customer

Top level Management

Both Customer and Developer.

 

REF:: Once the review is complete, the Software Requirements Specification is "signed-

off by both the customer and the developer.

 

 

Controlling Versions is activity of ________

Construction

Testing

SCM

Design

 

________ identify which quality standards are relevant to the project and determines how to satisfy them

Quality planning

Quality assurance

Quality control

Process control

 

The British Standards Institution (1986) has stated the quality as

The ability of a software product to satisfy its specified requirements

"An inherent or distinguishing characteristic or a property"

"Quality is in the eye of the beholder, a matter, of the client's judgment."

All of the given

 

 

________ ensures that the standards laid down for a project are followed.

Quality assurance 

Quality control 

Product evaluation 

Process control 

 

________ ensures that appropriate steps to follow the product development procedures are carried out

Quality Management 

Design

Process monitoring 

Quality Control

 

These all are Product Revision Factors except

Usability

Maintainability

Flexibility

Testability

 

To control versions, you can use_____________

Version Control File

Version Control Register

Version Control authority

All of given

 

 _________is an umbrella activity that ensures conformance to standards and procedures throughout the SDLC of a software product.

SQA

Design

Testing

All of given

 

All of the following are benefits of meeting quality requirements

An increase in stakeholder satisfaction

Less rework

Low turnover

Higher productivity

 

The Preliminary Users Manual presents the software as a black box: That is, heavy emphasis is placed on

User input

User output

User input and the resultant output

None of given

 

 Which of the following might require re-baselining of the cost baseline?

Corrective action

Revised cost estimates

Updates to the cost management plan

Budget updates

 

________ identify which quality standards are relevant to the project and determines how to satisfy them

 

Quality planning

Quality assurance

Quality control

Process control

 

 

The overall role of Software in a larger system is identified during 
Requirements engineering 
Process engineering 
System engineering 
All of given

The British Standards Institution (1986) has stated the quality as 
The ability of a software product to satisfy its specified requirements 
"An inherent or distinguishing characteristic or a property" 
"Quality is in the eye of the beholder, a matter, of the client's judgment." 
All of the given
www.vuzs.net
McCall (MCC77) and his colleagues proposed some software quality factors based on _______ most important aspects of a software product:


6 
5

Inefficient project management style is a
Product-related problems 
Technology-related problems 
Process-related problems 
People-related problems

Upon evaluating current problems and desired information (input and output), the analyst begins to ______ 
Synthesize solutions 
Model 
Specification 
All of given

These all are Product Revision Factors except
Usability 
Maintainability 

Flexibility
 
Testability

We can classify the problems that affect software projects into _______ categories 
3 

5 
6

The check-in and checkout facilities provide_________ 
Best control 
Component control 
SCI control 
Synchronization control

The code generation step performs the task
Translated specification into a machine-readable form 
Translated design into a machine-readable form 
Translated requirements into a machine-readable form 
Translated user data into a machine-readable form

Research-oriented software development is a
Technology-related problems 
Process-related problems 
People-related problems 
Product-related problems

A meeting is conducted at a _______ and attended by both software engineers and customers.
Software engineer site
Neutral site
Customer site
Company site

Reviews conducted at each of this phase/s_____
Analysis
Design
Coding
All of given


All given below are the problems that affect software projects except:

Product-related problems
Technology-related problems
Procedure-related problems
People-related problems


_______is the technical kernel of software engineering

Design
Implementation
Testing
Requirement Analysis

Both the software engineer and customer take an active role in software requirements engineering-a set of activities that is often referred to as

Analysis
Design
Specification
System acceptance

The model serves as the basis for the creation of ______ for the Software.
Design
Maintenance
Testing
Specifications

Before requirements can be analyzed, modeled, or specified they must be gathered through a/an _______
Elicitation process
Interviewing
Meeting

None of given

Technology-related problems include _____

Overestimated savings from reusable components and new tools and methods

Switching tools in mid-way

Integrating different software products in cross-platform implementation
All of given

Insufficient identification is a
Technology-related problems
Process-related problems
People-related problems

Product-related problems

Throughout evaluation and solution synthesis, the analyst's primary focus is on ______
"Not what, not "how"
"What, also "how"
"What, not "how"
None of given

The overall role of Software in a larger system is identified during
Requirements engineering 
Process engineering 
System engineering 
All of given


In problem evaluation area of effort, once problems have been identified, the ___________determines what information is to be produced by the new system and what data will be provided to the system.
Analyst 
Designer 
Coder 
Manager

A 'facilitator' controls the meeting can be ________

Customer 
A developer 
An outsider 
All of given

Version control combines ______ to manage different versions of configuration objects that are created during software product development.
Procedure 
Tools 
Procedure and Tools 
None of given

Many software projects digress from the original scope because of the nature of the software product or technology used, it's happen in ________
Product scope changed toward the end of the project life cycle 
Research-oriented software development 
Defined scope 
Fuzzy users


When you build a product or system, it's important to go through a series of predictable steps – a road map that helps you create a timely, high-quality result, The road map that you follow is called a ________
Software design 
Software process 
Software schedule 

Framework

Before requirements can be analyzed, modeled, or specified they must be gathered through a/an _______
Elicitation process 
Interviewing 
Meeting 
None of given

Defined scope is a
Technology-related problems 
Product-related problems 
Process-related problems 
People-related problems

 

You can use the Item Traceability Matrix to identify _______ at the end of each phase

SCIs

SCM

Design

Construction

 

Most software project manager's practice a lot of management techniques that are of doubtful authenticity are called

 Select correct option:

Project management tools

Project management myths

Project management thumb rules

Project management fundamentals

 

The Introduction of the software requirements specification states the

Select correct option:

 

Goals

Objective

Design

Goals and objectives of the software

 

The code generation step performs the task 

Select correct option: 

 

 Translated specification into a machine-readable form

 Translated design into a machine-readable form

 Translated requirements into a machine-readable form

 Translated user data into a machine-readable form

 

-----------is the ability to encourage by "push or pull" technical people to produce to their best ability.

 Select correct option:

 

Evaluating

Motivation

None of the given

Monitoring

 

__________contains an analysis of what went wrong, what went right, and what you could have done better in the software project.

 Select correct option:

Prepare closedown report

Identify learning

Identify reusable software components

 

 

 

Finally, the specification includes a ________

Select correct option:

 Bibliography

 Appendix

 Both Bibliography and Appendix

 

 

Product quality depends on its conformance to ______

 

Select correct option:

Software requirements

Development standards

Implicit requirements

All of given

 

Given all are major design styles except

Select correct option:

Object (Not Sure)

Procedural

Structured

Dtat-Structured Design

 

 

The quality of software is said to be high if it meets the

 

Standards, defined for the product

Procedures, defined for the product

Standards and procedures, defined for the product

Design defined for product



--
Zindagi mein 2 Logo ka buhat khayal rahkoooo
Ist woh jiss ney tumhari jeet ke Liye buhat kuch hara hoo
(Father)
2nd woh jiss ko tum ney har dukh me pukaara hoo (Mother)
Regards,
Umair Saulat Mc100403250

--
--
Virtual University of Pakistan*** IT n CS Blog
================================
http://www.eNoxel.com
http://www.enoxelit.tk
http://www.geniusweb.tk
 
and Please do Share this group with your Friends and Class Fellows so that our Circle would expand and can be more useful for other Students.
 
Thanks, n Best of Luck......
 
 
You received this message because you are subscribed to the Google
Groups "vulms" group.
To post to this group, send email to vulmsit@googlegroups.com
To unsubscribe from this group, send email to
vulmsit+unsubscribe@googlegroups.com
For more options, visit this group at
http://groups.google.com/group/vulmsit?hl=en?hl=en
---
You received this message because you are subscribed to the Google Groups "vulms" group.
Visit this group at http://groups.google.com/group/vulmsit?hl=en-GB.
 
 

No comments:

Post a Comment